-Property Service Upgrade: Scaled the main service to handle the high-amperage demands of six robotic milking units and industrial ventilation.

-Standby Power Integration: Installed a large-scale industrial standby generator with an Automatic Transfer Switch (ATS) to ensure the robots, cooling systems, and milk pumps never lose power.

-Underground Conversion: Removed overhead hydro poles and trenched all primary lines. This "cleaned up" the yard for better maneuverability

-Specialized Barn Wiring: Custom electrical fit-out for an overshot, forced-flow barn design, ensuring optimal placement of all electrical components